At Seatown Electric we handle all aspects of home wiring. We specialize in Whole Home Rewiring, The Seattle area is filled with Knob and Tube wiring. Our goal is to eliminate as much as possible. Seattle Electricians must be well trained in Knob and Tube wiring since there is so much of it in Seattle. A small job like adding aditional outlets might require Knob and Tube rewiring.
Our electrical codes have changed drastically in 2008-2016. If we add outlets, or even replace outlets we are required to install some sort of AFCI protection. AFCI protection stands for Arc Fault Circuit Interupter. This device is designed to protect the home from low current arcing. You can either install AFCI protection at the panel box, or replace the device (outlet) with an AFCI protected outlet, they look similar to GFCI outlets.
Since AFCI protection is required and they are designed to find faults they tend to find faults when they are hooked up to Knob and Tube. This is why it sometimes makes sense to just get rid of the Knob and Tube.
Knob and Tube wiring is rumored to be "safe" if it has not been tampered with. I find this statement to be false. Knob and tube is designed for eary 1900 era equiptment. Take a step back into time and imagine what that looked like, a small table lamp or two, 1-2 outlets per room for small radios. This wiring was not designed for compact wall heaters, curling irons, 3-4 wall TV's per home, toaster, surround sound, computers etc... Not to mention all of that new age equiptment has no ground protection with Knob and Tube wiring.
If you have Knob and Tube it should be replaced, SeaTown Electric, you're Seattle Electricians can help replace this old wiring. (206)-293-0037
www.seatownelectric.com
Showing posts with label NEC code. AFCI protection. Show all posts
Showing posts with label NEC code. AFCI protection. Show all posts
Saturday, May 28, 2016
Wednesday, March 18, 2015
Redmond Washington Electrical Troubleshooting
Another service call for Seatown Electric, this customer had one of there upstairs circuits that was not working. We started at the electrical panel and checked every circuit to make sure the breakers were in the on position. The customer said they checked every single breaker, But just to be safe we like to run our fingers down the Breakers and put slight tension on them to see if one is tripped in the on position. There is a lot of service calls that electrical contractor go on in the Seattle area that are similar to this, and most of the time it is an easy fix. We look for the obvious, a bad breaker, tripped GFCI or loose wiring first.
In this case it was a tripped breaker, stuck in the on position. A good tip for home owners to look at to save a trip fee is to turn every breaker off hard then back on. This will reset the breaker if it is in fact tripped, but in the on position. The video above can help everyday homeowners troubleshoot a simple fix.
After setting the breaker back on, power was restored. Job complete. Another satisfied Angies List customer
For questions or to schedule a free estimate please call (206)-293-0037 or visit Our Website
In this case it was a tripped breaker, stuck in the on position. A good tip for home owners to look at to save a trip fee is to turn every breaker off hard then back on. This will reset the breaker if it is in fact tripped, but in the on position. The video above can help everyday homeowners troubleshoot a simple fix.
After setting the breaker back on, power was restored. Job complete. Another satisfied Angies List customer
For questions or to schedule a free estimate please call (206)-293-0037 or visit Our Website
Tuesday, March 17, 2015
West Seattle Knob and Tube Rewire
This particular rewire stemmed from another Angies List Customer calling in to get his 1920's Knob and Tube wiring looked at. The home is located in West Seattle. The process for the home inspection begins with taking off all of the wall plates. Most Electrical contractors will only use a plug checker to determine the extent of the knob and tube, not Seatown Electric. Our process is very thorough and accurate, leaving all of our customers with a detailed report of how much of the home is knob and tube, and what condition it is in. We have a 24hr turnaround process for all of our estimates, so the bid process does not drag out.
After a few back and forth e-mails confirming scope of work and misc. additional items, the homeowner let us know that we where the middle bid. Our price for the rewire was not too high and not too low. We scheduled the work for 5 total working days.
The house was vacant during the rewire (this is not required) but does help. There are many different Wiring Methods, but after many rewires, we believe we have found the best most efficient way to do them. On day one, we focus on pulling out all of the old switches and outlets. We aren't concerned with keeping the old outlets since they aren't Tamper Resistant which is required in the 2014 NEC Code. Not every single outlet is required to be Tamper Resistant, but enough for Seatown Electric to make it a company policy that all outlets will be Tamper Resistant.
Once the outlets and switches are removed, the next step is to remove all of the old metal boxes. This home had lath and plaster, so we had to be very careful not to knock out pieces of the wall. Using a flat head screw driver we disassemble and pry out the old boxes. Then cut out the opening for the new Plastic Cut In Box. After all the new boxes are cut out, we vacuum up all of the lath and plaster pieces and shake off the drop clothes in the trash, to get ready for the next steps.
Getting all of the boxes out and removing the knob and tube will take up most of day one. On day two, home run wires are pulled. Home runs are the start of the new circuit. Basically, they come from
the electrical panel to the start of the circuit. Once they are all pulled in, we start fishing wires in to all of the new electrical box locations. NMB Wiring is used for all of the new electrical installed. The next few days we are fishing in the new circuits.
Seattle Electrical Code only requires you to rewire the dwelling "as is" meaning you only need to rewire to the existing locations. Labor and Industries will sometimes make you rewire "up to NEC Code" meaning you have to add outlets and switches. This adds a minimum of 3-5 days. Since the home was in Seattle territory, we only added outlets that the homeowner requested.
On the last day of the rewire the circuits are all attached to the Electrical panel. This homeowner chose to purchase the best Electrical Panel we offer. It comes with a copper bussing, whole home surge protection, updated grounding and bonding, panel labeling, and limited lifetime warranty on all parts.
A thorough testing of all the circuits is done after power is restored to the home. Everything worked perfect the first time. Inspection was scheduled the next day, and passed off the first time. This whole home rewire went about as smooth as it could have. Another satisfied Angies List customer.
After a few back and forth e-mails confirming scope of work and misc. additional items, the homeowner let us know that we where the middle bid. Our price for the rewire was not too high and not too low. We scheduled the work for 5 total working days.
The house was vacant during the rewire (this is not required) but does help. There are many different Wiring Methods, but after many rewires, we believe we have found the best most efficient way to do them. On day one, we focus on pulling out all of the old switches and outlets. We aren't concerned with keeping the old outlets since they aren't Tamper Resistant which is required in the 2014 NEC Code. Not every single outlet is required to be Tamper Resistant, but enough for Seatown Electric to make it a company policy that all outlets will be Tamper Resistant.
Once the outlets and switches are removed, the next step is to remove all of the old metal boxes. This home had lath and plaster, so we had to be very careful not to knock out pieces of the wall. Using a flat head screw driver we disassemble and pry out the old boxes. Then cut out the opening for the new Plastic Cut In Box. After all the new boxes are cut out, we vacuum up all of the lath and plaster pieces and shake off the drop clothes in the trash, to get ready for the next steps.
Getting all of the boxes out and removing the knob and tube will take up most of day one. On day two, home run wires are pulled. Home runs are the start of the new circuit. Basically, they come from
the electrical panel to the start of the circuit. Once they are all pulled in, we start fishing wires in to all of the new electrical box locations. NMB Wiring is used for all of the new electrical installed. The next few days we are fishing in the new circuits.
Seattle Electrical Code only requires you to rewire the dwelling "as is" meaning you only need to rewire to the existing locations. Labor and Industries will sometimes make you rewire "up to NEC Code" meaning you have to add outlets and switches. This adds a minimum of 3-5 days. Since the home was in Seattle territory, we only added outlets that the homeowner requested.
On the last day of the rewire the circuits are all attached to the Electrical panel. This homeowner chose to purchase the best Electrical Panel we offer. It comes with a copper bussing, whole home surge protection, updated grounding and bonding, panel labeling, and limited lifetime warranty on all parts.
A thorough testing of all the circuits is done after power is restored to the home. Everything worked perfect the first time. Inspection was scheduled the next day, and passed off the first time. This whole home rewire went about as smooth as it could have. Another satisfied Angies List customer.